Thursday, 29 April 2010

To day was the last day. from the start of the day it was a bit hectic and stressful getting the power point finished and all of it ready for when we had the meeting after lunch. be for the meeting some of the things that we faced was things like not beaning able to get some of the shots to the power point and there was a very scary moment were I thort I had lost the final work (i had lost it in the saved files of the Pc I was working on after some time I found it)

After lunch we had the meeting with the owner of shaken moos i think this went well for our group as we had the final product to show him on the screen along with our power point and our pitch to him which we had been working on before lunch. when our group was speaking about our work we spoke well as he could here us, I think I did well in the pitch as I was protecting my voice also making sure i was coming across like I knew what I was speaking about which was one of the things i was worrying about and not just look like I was reading piece of paper.

After all of the groups had done this we went on to start righting up our final evaluation

Wednesday, 28 April 2010

Today we finished it all of. The was grate as have put a lot of time in to the final piece and had a lot of times were i wanted to just kill it and burn it... But i got past that amd made it look grate (well i think) i had some rubble with the photo shop were at times but it was never that bad at all it was only ever small things that were ronge which with a bit of help were all fine and dandy. also this week we made a power point for our presentation next week that pbit went well aswell. i think we worked well today as we all went off and did what was needed doing at a good pace and got it all done to a high stander.
to day we almost finished our product which was a very good thing=) as we had been workinf on it for a while also we had to make sure anything for the course what was not done was up to date and was all up to standered